A completed Lagforce pipework insulation and aluminium cladding installation at a wastewater treatment facility in Donegal.

The work shown
The gallery photographs show insulated pipe runs finished with aluminium cladding. Formed sections follow changes of direction and fittings, giving the installation a protective outer finish.
Details that matter on external pipework
Cladding needs to accommodate bends, branches and service connections. When planning a similar scope, the specification should consider the operating conditions, weather exposure and access required for maintenance.